- Update the System Requirements, Design, and Implementation Specification title page with the new date.
- Update the previously completed sections based on the instructor’s feedback.
- Test and Quality Assurance Plan
- Develop a plan for unit testing. Include specific application functions that will be tested and how the tests will be conducted.
- Develop a plan for system testing. Include areas that you will test within both the application and a system as a whole and how errors will be tracked and reported.
- Develop a plan for user acceptance testing. Include key stakeholders who should perform the test and how they will record any issues that they find.
- Develop a quality assurance plan. Include specific quality assurance methods or control, what their purpose is, and in which phase they will be utilized.
- Name the document “yourname_IT425_IP3.doc.”
Related
https://homeworkyard.com/wp-content/uploads/2022/01/LOGO.png
0
0
Simon
https://homeworkyard.com/wp-content/uploads/2022/01/LOGO.png
Simon2022-01-14 17:22:582022-01-14 17:22:58system analysis design 0